Chilled to Perfection

Chilled to Perfection 800 600 weblines
  • 06 September, 2020

Chilled to Perfection

The $72M NewCold Advanced Cold Logistics Facility #2 involved the construction of an equivalent 12-storey insulated cold storage high bay warehouse facility for storing pallets of cold food with a level of automation not previously seen in Australia. The development includes an automated pick and pack order system, oxygen-reducing fire safety technology, and a state-of-the-art design which will deliver a significant reduction in electricity consumption.

Read about the Newcold Advanced Cold Logistics Facililty